Built for complex projects.Organized for speed.
SIC is the Saudi contracting company of LEES Engineering Group. We bring design coordination, installation and technical verification together under one team, for facilities that cannot afford rework.
Steam boilers and utility systems · Design & installationDEEF Pharma — fast-track pharmaceutical project, completed in 20 days
Air-handling and packaged units installed and maintained for InoChem
KAFD MEP shop drawings and as-built documentation
Cleanroom environments engineered to project cGMP requirements
One contractor from first drawing to final handover.
Most delays happen at the interfaces: between design and site, between trades, between installation and validation. SIC is organized to close those gaps. The same coordinated team carries a project through BIM, procurement, installation, testing and qualification.
- 01
Coordinated before it is built
LOD 300–500 BIM models and clash detection resolve conflicts on screen, not on site.
- 02
Parallel, not sequential
Design, procurement and site activities run as planned parallel workstreams to compress the programme.
- 03
Verified, not assumed
Testing, balancing, commissioning and DQ/IQ/OQ/PQ support are planned from day one.
Engineered for critical environments.
We focus on facilities where the building services are part of the process itself.
01Pharmaceutical & cleanroom
Engineering for controlled manufacturing, laboratories and critical utilities.
Learn more
02Data centers & critical infrastructure
MEP engineering for facilities where continuity of operation matters.
Learn more
03Food, meat & dairy
Systems designed around hygiene and temperature control.
Learn more
04Healthcare
Critical services for clinical environments.
Learn moreA clear plan, then fast execution.
Every SIC project follows the same four-stage framework, so scope, schedule and acceptance criteria are defined before the first crew mobilizes.
- 01
Scope & requirements
Define the scope, client requirements, deliverables and applicable technical standards, including GMP requirements where relevant.
- 02
Schedule & resources
Establish the programme, delivery milestones, team allocation, resource needs and procurement priorities.
- 03
Coordination & execution
Coordinate design, procurement and site activities. Plan parallel workstreams to support fast-track delivery.
- 04
Quality & handover
Define inspections, testing, commissioning and qualification requirements, together with handover documents and acceptance criteria.
Clear scope. Coordinated delivery. Defined quality.
DEEF Pharma — delivered in 20 days.Every discipline under one contract.
Electrical, fire protection & BMS
Coordinated power, controls and life-safety infrastructure.
HVAC & environmental control
Air and water systems for comfort, production and controlled environments.
Plumbing & process utilities
Reliable distribution from the building connection to the process.
BIM & technical engineering
Resolve interfaces early. Give the site a coordinated basis for execution.
Commissioning & ongoing support
Connect installation quality with readiness for operation.
Industrial equipment & supply
SCALABLE is the Group’s planned specialist supply activity.
Trusted on Saudi projects.
Selected experience across SIC and LEES Engineering Group teams.
A Saudi company with regional engineering depth.
SIC is a registered Saudi limited liability company, headquartered in Riyadh’s 2nd Industrial City and backed by the design, audit and qualification expertise of LEES Engineering Group.
Planning a facility in the Kingdom?
Share your scope and schedule. We will come back with a coordinated approach.